Water and sewer billing. Rates for water and sewer service provided by the Stoney Creek Sanitary District shall be billed on a bimonthly basis in arrears.
Rates
Type of Fee | Amount of Fee |
Water | |
0 to 3,000 gallons | $40.95 minimum rate |
3,001 to 6,000 gallons | $5.25 per 1,000 gallons |
Over 6,000 gallons | $10.50 per 1,000 gallons |
Sewer | |
0 to 3,000 gallons | $53.55 minimum rate |
3,001 to 6,000 gallons | $5.25 per 1,000 gallons |
Over 6,000 gallons | $10.50 per 1,000 gallons |
Sewer flat rate for unmetered customers | $94.50 billed bimonthly |
Connection Fees
Type of Fee | Amount of Fee |
Water | |
0 to 3/4-inch service line | $4,000 |
1-inch service line | $7,200 |
1 1/2-inch service line | $16,000 |
2-inch service line | $28,400 |
Sewer | |
0 to 3/4-inch service line | $6,000 |
1-inch service line | $10,800 |
1 1/2-inch service line | $24,000 |
2-inch service line | $42,600 |
Water and sewer connections larger than two-inch. The charge for a connection larger than two-inch shall be calculated by using the Virginia Department of Health Waterworks Regulation Design Criteria. Connection fees based on this criteria shall be calculated by dividing the total number of design gallons by 250 (equivalent single-family unit) and multiplying by the rate established for a 3/4 inch service line.
Criteria for payment of water and/or sewer connection fees. An actual connection sufficient to commence water and/or sewer service to a building, along with the obtaining of all necessary building permits, must be made within six months of payment of the connection fee. If such connection is not made within such time period, the party paying the fee may still connect to the system upon paying the fee then in effect at the time of actual connection. A credit of 100% will be given for the previously paid connection fee.
Other Fees
Type of Fee | Amount of Fee |
Late fee | 10% of the current amount due after the 20th |
Returned check fee | $36.00 |
Involuntary disconnect due to disaster where unit is uninhabitable | No charge |
Voluntary Disconnect Fee | $50.00 |
Nonpayment disconnect processing fee | $50.00 |
Account transfer | $20.00 |
Renter security deposit | |
Both water and sewer | $200.00 |
Water or sewer | $100.00 |
After-hours service call | Time and materials with minimum $50.00 fee |
Service Lock Fee | $30.00 |
Construction inspection fee | $0.50/foot |